Lanes/
Laredo, TX to Elizabeth, NJ freight

Laredo, TX to Elizabeth, NJ freight

The Laredo to Elizabeth corridor runs within the U.S., feeding the border gateway.

Direction

U.S. border feeder

Equipment on this lane

Dry van-led, with open deck and reefer demand

Carrier availability

Vetted carriers cover this corridor

Marketplace activity

Posted by brokers on the Cargado marketplace

<div class="lane-viz"><div class="lane-viz-mapwrap"><img class="lane-viz-map" src="https://cargado-lane-maps.pages.dev/laredo-tx-to-elizabeth-nj.svg" alt="Laredo, TX to Elizabeth, NJ freight route map on Cargado" loading="lazy" width="1000" height="620"></div><div class="lane-viz-panel"><div class="lane-viz-title">Transit time</div><div class="tr"><div class="trrow tot"><span>Transit</span><b>4 days</b></div><div class="trmi">1965 mi driving</div></div><div class="lane-viz-title">Typical market range</div><div class="lane-rate-band" style="font-size:1.75rem;font-weight:700;color:#16295c;margin:.15rem 0 .6rem">$6K–$7K</div><a class="lane-cta" href="https://cargado.com/brokers/get-a-demo">Request a demo for detailed rates </a><div class="lane-viz-fine">Estimated drive time by road, split at the border. Border dwell varies with documentation and crossing.</div></div></div>

This corridor connects the Laredo market with the Elizabeth market (Linden, Newark, Kearny, Elizabeth, Edison), running within the U.S., feeding the border gateway. Over the past 12 months brokers posted this corridor to the Cargado marketplace.

Recent carrier bids on this corridor typically land in the $6K–$7K range. Request a demo to see detailed, current rates for this lane.

What ships from Laredo

Freight out of the Laredo market leans toward automotive parts, metals and building materials and machinery and industrial equipment based on what brokers actually post there. You can read more about moving these goods on the freight types pages.

Equipment on this corridor

Dry van-led, with open deck and reefer demand. Browse equipment definitions in the glossary if a term is unfamiliar.

Feeding the border

This U.S. leg connects inland freight with the border gateway at Laredo. Loads typically stage or transload there before crossing into Mexico, or distribute onward after clearing customs northbound. See the border crossings directory for how the gateway operates.

On Cargado, this corridor is covered by a marketplace of verified carriers bidding on freight from hundreds of brokers, with rate context drawn from real bids rather than surveys.

The markets on this lane

Origin market

Laredo, TX

Laredo is the busiest U.S. land port for trucks with Mexico, with 46.1% of U.S.-Mexico truck freight value in 2025. Computer-related machinery, electrical equipment and vehicles are the leading U.S.-Mexico truck commodities by value, and fresh produce from Mexico also crosses at Laredo.

Industries: Electronics, auto parts, electrical equipment, produce

  • Border crossings: World Trade Bridge and Colombia Solidarity Bridge commercial facilities. Source
  • Intermodal or rail yard: Union Pacific intermodal terminal handling container and trailer-on-flatcar traffic. Source
  • Industrial park: Gateway International Rail Park in Webb County, off IH-35 and TX 255, 19 miles from the World Trade Bridge. 1,950 acres. Source
  • Free-trade zone: Foreign-Trade Zone 94, Unitec Industrial Center site on Interstate 35. 682 acres, 3.51 activated (operating). Source

Distribution: Foreign-Trade Zone 94 industrial space on Interstate 35 and the rail-served Gateway International Rail Park.

Destination market

Elizabeth, NJ

Elizabeth and Newark, New Jersey, are the container hub of the busiest port on the East Coast, with large marine terminals, on-dock rail, an airport cargo area and a large warehouse market. Containers move out by truck to nearby warehouses and by CSX and Norfolk Southern rail to the Midwest and Eastern Canada. Container terminal modernization and harbor deepening are planned, and a rebuilt truck entrance is scheduled for completion in 2028.

Industries: Container shipping, rail intermodal, vehicle imports and exports, air cargo and express parcels, warehousing and distribution

  • Seaport: Marine container terminals at Port Newark and Elizabeth, part of the Port of New York and New Jersey, the busiest port on the East Coast. 5,955,798 loaded TEUs port-wide in 2025 (operating). Source
  • Seaport: Modernization and expansion of container terminal operations and infrastructure across the port, and planned harbor deepening to 55 feet with the U.S. Army Corps of Engineers. More than $1.2 billion in private investment (planned). Source
  • Intermodal or rail yard: ExpressRail on-dock rail system, reaching the Midwest, New England and Eastern Canada (operating). Source
  • Seaport: Port Street Corridor northern entrance, a truck entrance rebuild; construction began November 2023; completion scheduled 2028. $220 million (under construction). Source
  • Airport: Newark Liberty International Airport cargo area. About 680,000 short tons of air cargo in 2025 (operating). Source
  • Foreign-trade zone: Foreign-Trade Zone No. 49, covering Port Newark, the Elizabeth marine terminal and the Port Jersey marine terminal. Source

Distribution: The Port Authority counts nearly one billion square feet of warehouse and distribution space within 50 miles of the port (2020).

Market profiles describe industries and facility types from public government, industry, port, railroad and industrial-park sources. They name no shippers, manufacturers, retailers or logistics companies.

Common questions about this lane

How do I find carriers for Laredo to Elizabeth?

On Cargado, brokers post the corridor and vetted carriers bid on it. Every carrier is verified before it can bid, which replaces cold-calling unknown carriers.

What equipment is available on the Laredo to Elizabeth corridor?

Postings here lean dry van-led, with open deck and reefer demand. If you need a type you do not see, post the load anyway. Carriers with matching equipment get notified automatically.

Why is a U.S. lane on a Mexico freight marketplace?

Because it feeds the border. Cross-border programs need the inland leg to and from the gateway, and brokers post those legs alongside the international move so one carrier network covers the whole program.

Moving freight on this lane?

Post it to 2,350+ vetted Mexico and Canada carriers, or check market rates built from real carrier bids before you quote.